desic · lead-handoff 40 seconds. Caption-only. AI simulation; sample records; local actions. 0.00–5.73s: Cedar Solar needs a reply and an owner. 5.73–12.98s: Prepare the reply and route from the inquiry. 12.98–22.21s: The inquiry supplies the workload and reminder rule. 22.21–29.93s: Review the reply, stop rule, and assigned owner. 29.93–40.00s: The handoff keeps its source, owner, and next action.